Click on the report link below for full information
Final draft of land studies

Click on the report link below for full information
Updated MS4 Progress Report 

MS4 Permit Information

Glenolden Borough has an MS4 permit issued by DEP which regulates the municipal separate storm sewer system. The MS4 permit requires the Borough to implement a stormwater management program designed to reduce the discharge of pollutants from the storm sewer system and that this program consists of six different areas. The six areas (i.e., the Minimum Control Measures) can be seen at the link to the EPA MS4 Overview site.

Several beneficial storm water related sites are:

These useful websites will allow you to have access to additional stormwater information.